BENCHMARK LOG BOOK
6 720 806 768 (2013/02)70
27 BENCHMARK LOG BOOK
6 720 802 421-01.1I
Notes: [1] Installers should be members of an appropriate Competent Persons Scheme. [2] All installations in England and Wales must be notified to Local Area Building Control (LABC) either
directly or through a Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer. [3] May be required for systems covered by G3 Regulations
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
GROUND SOURCE HEAT PUMP COMMISSIONING CHECKLIST
This Commissioning Checklist is to be completed in full by the competent person who commissioned the heat pump and associated equipment as a means of
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights
Customer Name
Address
Telephone Number
Heat Pump Make and Model
Heat Pump Serial Number
Commissioned by (print name) Certified Operative Reg. No.
[1]
Company Name & Address Commissioning Date
Telephone No.
Building Regulations Notification Number (if applicable)
[2]
CENTRAL HEATING MODE
Measure and Record
Heating Flow Temperature °C Heating Return Temperature °C
ALL SYSTEMS
The heating system has been filled and pressure tested Yes
Expansion vessel for heating is sized, fitted & charged in accordance with manufacturer’s instructions Yes
The heat pump is fitted on a solid/stable surface capable of taking its weight Ye s
The system has been flushed and cleaned in accordance with BS7593 and heat pump manufacturer’s instructions Yes
What system cleaner was used?
What inhibitor was used? Qty litres
Are all exposed external pipeworks insulated? Yes
CONTROLS - SYSTEM AND HEAT PUMP
Tick the appropriate boxes if applicable
1. Time & Temperature Room Thermostat & Programmable Load/Weather Optimum Start
Control to Heating Programmer/Timer Roomstat Compensation Control
2. Time & Temperature Cylinder Thermostat & Combined with Heat
Control to Hot Water Programmer/Timer pump main controls
3. Heating Zone Valves (including underfloor loops) Fitted Not Required
4. Hot Water Zone Valves Fitted Not Required
5. Thermostatic Radiator Valves Fitted Not Required
6. Heat Pump Safety Interlock
[3] Built In Provided
7. Outdoor Sensor Fitted Not Required
8. Automatic Bypass System Fitted Not Required
9. Buffer Vessel Fitted Yes No If YES, Volume Litres
Commissioning Engineer’s Signature
Customer’s Signature
(To confirm demonstration of equipment and receipt of appliance instructions)
ALL INSTALLATIONS
The heating, hot water and ventilation systems complies with the appropriate Building Regulations Ye s
All electrical work complies with the appropriate Regulations Yes
The heat pump and associated products have been installed and commissioned in accordance with the manufacturer’s instructions Ye s
The operation of the heat pump and system controls have been demonstrated to the customer Yes
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer Yes
BORE HOLE/GROUND LOOPS
Bore Hole Ground Loop Length/Depth m
The ground loops/bore hole pipes have been filled and pressure tested in accordance with relevant British Standards Yes
If more than one 1 collector has been used has the system been hydraulically balanced (Flow balancing/regulating valves fitted & adjusted)? Yes
Has the system been vented/de-aired? Yes
Are system filters fitted & clean? Yes
Is the system topped up to the correct level? Yes
Was the system cleaned & flushed prior to use? Yes
Are isolating valves in their correct position Yes
What system cleaner was used? Qty litres
What antifreeze was used? Qty litres
What temperature will the antifreeze protect to? °C
What inhibitor was used (if not included in Antifreeze)? Qty litres
Record incoming collector fluid temperature °C
Record outgoing collector fluid temperature °C
DOMESTIC HOT WATER MODE
Measure and Record
Is the heat pump connected to a hot water cylinder? Unvented Vented Thermal Store Not Connected
Hot water has been checked at all outlets Yes Have Thermostatic Blending Valves been fitted? Yes Not required
ADDITIONAL SYSTEM INFORMATON
Additional heat sources connected: Gas Boiler Oil Boiler Electric Heater Solar Thermal Other