the chassis, then the two rear brackets positioned with just enough space to accommodate
the width of the Telco rack. Finish by sliding the chassis into the rack and tightening the
brackets to the rack.
Turning on the system
The last thing to be done is to provide input power to the system.
To turn on the system:
1. Plug the power cord from the power supply unit into a high-quality power strip that offers
protection from electrical noise and power surges. We recommended using an
uninterruptible power supply (UPS).
2. Press the power button on the control panel to turn on the system.
4.4
28 en | Rack installation DIVAR IP 6000 2U
2014.01 | V2 | DOC Installation Manual Bosch Sicherheitssysteme GmbH
Commentaires sur ces manuels