Bosch 25/32kW Manuel d'instructions

Naviguer en ligne ou télécharger Manuel d'instructions pour Chauffe-eau et chaudières Bosch 25/32kW. Bosch 25/32kW Instruction manual [en] Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 52
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
GREENSTAR HEATSLAVE EXTERNAL
12/18, 18/25, 25/32kW
FLOOR STANDING EXTERNAL OIL FIRED CONDENSING COMBINATION
BOILER USING BALANCED FLUE SYSTEM
FOR OPEN VENT AND SEALED CENTRAL HEATING SYSTEMS WITH DOMESTIC MAINS FED HOT WATER
THE APPLIANCE IS FOR USE WITH KEROSENE ( 28 SECOND
OIL) ONLY
INSTRUCTION MANUAL
INSTALLATION COMMISSIONING
& SERVICING
GB
THE APPLIANCE IS FOR USE WITH KEROSENE ( 28 SECOND
OIL) ONLY
INSTRUCTION MANUAL
GB
Vue de la page 0
1 2 3 4 5 6 ... 51 52

Résumé du contenu

Page 1 - 12/18, 18/25, 25/32kW

GREENSTAR HEATSLAVE EXTERNAL12/18, 18/25, 25/32kWFLOOR STANDING EXTERNAL OIL FIRED CONDENSING COMBINATIONBOILER USING BALANCED FLUE SYSTEMFOR OPEN VEN

Page 2 - Hardware/Literature pack

OIL SUPPLYThis appliance is suitable for kerosene (28second oil) only, no other fuel must be used.OIL SUPPLY:• Plastic or steel tanks should be instal

Page 3 - CONTENTS

TYPICAL OPEN VENT SYSTEMDR RR RCTLTLTLLLES1000mm min.FGDTYPICAL SEALED SYSTEMDR RR RBPDCTLTLTLLLAUHGINSTALLATIONCOMMISSIONINGA - Appliance expansion v

Page 4 - 8 716 113 389b (09/07)

WATER SYSTEMS & PIPEWORKFILLING PRIMARY SEALED SYSTEMS:• Filling the system must comply with one of the methods shown opposite.• The filling point

Page 5 - Check List

KJbECInvert450 min.AcDAC75mmmin.aABCD400mmmin.500mm min.dFIHGAC25mmmin.200mm min.(Unsuitable for clay soil types) CONDENSATE &PRESSURE RELIEF PIPE

Page 6 - TECHNICAL DATA

BOILER LOCATION & CLEARANCESINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (

Page 7 - LAYOUT & COMPONENTS

CABINET MOUNTED LOW LEVELFLUE TERMINAL POSITIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32

Page 8 - CLEANING PRIMARY SYSTEMS

HIGH LEVEL FLUE TERMINAL POSITIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE 12/18-18/25-25/328 716 106 252d (08/07)1

Page 9 - MAINS SUPPLIES

BALANCED EXTERNAL OILFITFLUE OPTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 38

Page 10 - OIL SUPPLY

BALANCED FLUE OPTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 17PR

Page 11 - WATER SYSTEMS & PIPEWORK

Unpacking:It is advised that two or more persons are involvedin the transfer of the packaged boiler from the vanto the point of delivery.1  Once the

Page 12

INSTALLATION &SERVICING INSTRUCTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 11

Page 13 - PRESSURE RELIEF PIPEWORK

All dimensions in mm256 6505880225881105171374161 650787670518105 9455269658669705715 65079467051815812489.555658679698718528230INSTALLATIONCOMMISSIO

Page 14 - CLEARANCES

BOILER INSTALLATIONNote: The cabinet is not load bearing itonly provides weather protection for theboiler inside.1Mark position of the 100mm services

Page 15 - CABINET MOUNTED LOW LEVEL

INSTALLATION NOTES: Ensure all the seals are in good condition and seated properly. To ease assembly of flue components, grease seals lightly with t

Page 16 - POSITIONS

COMBUSTION CHAMBERINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 22INSTA

Page 17 - FLUE OPTIONS

PIPEWORK CONNECTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 23INS

Page 18 - HORIZONTAL FLUE OPTIONS

PIPEWORK CONNECTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 24INS

Page 19 - UNPACKING THE BOILER

OIL BURNER & PUMPINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 25IN

Page 20 - PIPEWORK & FLUE POSITIONS

REFITTING COMPONENTSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 26IN

Page 21 - BOILER INSTALLATION

ELECTRICSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 27INSTALLATIONFR

Page 22 - FLUE INSTALLATION

ELECTRICSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 28INSTALLATIONX4

Page 23 - COMBUSTION CHAMBER

SAFETY & REGULATIONSIMPORTANT INFORMATION AND SYMBOLS 1SAFETY PRECAUTIONS AND INSTALLATION REGULATIONS 3APPLIANCE INFORMATIONGENERAL INFORMATION

Page 24 - PIPEWORK CONNECTIONS

PRE-COMMISSIONINGCHECKS - APPLIANCEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389

Page 25

FILLING THE SYSTEMINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 30COMMI

Page 26 - OIL BURNER & PUMP

STARTING THE APPLIANCEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 31C

Page 27 - REFITTING COMPONENTS

STARTING THE APPLIANCEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 32C

Page 28 - ELECTRICS

STARTING THE APPLIANCEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 33C

Page 29

STARTING THE APPLIANCEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 34C

Page 30 - APPLIANCE

WATER TREATMENTINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 35COMMISSI

Page 31 - FILLING THE SYSTEM

31FINISHING COMMISSIONING -APPLIANCEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 3

Page 32 - STARTING THE APPLIANCE

INSPECTION AND SERVICEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 37I

Page 33

INSPECTION AND SERVICEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 38S

Page 34

SAFETY PRECAUTIONS& INSTALLATION REGULATIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32

Page 35

INSPECTION AND SERVICEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 39S

Page 36 - WATER TREATMENT

INSPECTION AND SERVICEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 40S

Page 37 - FINISHING COMMISSIONING

SHORT PARTS LIST 12/181 Burner - Sterling 40Part Number: 8 716 112 507 02 Combustion head - burnerPart Number: 8 716 112 604 03 Control box Satronic D

Page 38 - INSPECTION AND SERVICE

SHORT PARTS LIST 18/25INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 42S

Page 39

SHORT PARTS LIST 25/32INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 43S

Page 40

PROBLEM CAUSE REMEDYLOCKOUT:Pulsation on start Combustion settings incorrect Set up as in installation instructionsFaulty nozzle Replace nozzleIntermi

Page 41

FAULT FINDINGPROBLEM CAUSE REMEDYFAULTY BOILEROPERATION:Noisy operation Pump noise from air in pump orworn pumpBleed air from pump or replace pumpWorn

Page 42 - SHORT PARTS LIST 12/18

Boiler notoperatingwith aheating /hot waterdemandBurnermotor runs?Burnerlights immediatelymotor runs?230V atsolenoid coilin purge?Replacecontrol boxRe

Page 43 - SHORT PARTS LIST 18/25

Boiler notoperatingwith aheating /hot waterdemandBurnermotor runs?Lockoutwithin 1second?Replacecontrol boxReplacemotor/pumpCheck boilercontrols &s

Page 44 - SHORT PARTS LIST 25/32

ELECTRICAL SCHEMATICLNNC1BOILER MODEINDICATORX9 (PIN 2)NX1 (PIN 1)FROST THERMOSTATSPROGRAMMERFUSE F13.15AFASTCERAMICX2(FS)X2 (FR)X2 (FR)X4 (PIN 3)X4 (

Page 45 - FAULT FINDING

GENERAL INFORMATIONINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 4APPLI

Page 46

SERVICE INTERVAL RECORD It is recommended that the heating system is serviced regularly andthat you complete the appropriate Service Interval Record O

Page 47 - SATRONIC CONTROL BOX

SERVICE 1DATEENGINEER NAMECOMPANY NAMETEL No.OFTEC REG No.PUMP PRESSURE: psi CO2%:NOZZLE CHANGED? YES NOF.G.T. °C

Page 48 - 535 SE/LD RDB CONTROL BOX

CONTACT INFORMATIONWORCESTER, BOSCH GROUP:TECHNICAL: 08705 266241SERVICE: 08457 256206SPARES: 01905 752571LITERATURE: 01905 752556TRAINING: 01905 7525

Page 49 - ELECTRICAL SCHEMATIC

TECHNICAL DATAINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/328 716 113 389b (09/07) 5TECHNICAL

Page 50 - OIL BOILER COMBUSTION RECORD

LAYOUT & COMPONENTSThe diagram opposite excludes the top, frontand RH side casing panels.1. CONTROL BOX ASSEMBLY2. DIVERTER VALVE3. PRESSURE

Page 51

CLEANING PRIMARY SYSTEMSBEFORE CLEANING THE SYSTEM:ENSURE THE SYSTEM AND PIPEWORK ISIN GOOD WORKING ORDER.FLUSH THE EXISTING SYSTEM WITH APOWER FLUSHI

Page 52 - CONTACT INFORMATION

MAINS SUPPLIESELECTRIC SUPPLY:• Supply: 230V - 50Hz.• Cable: PVC insulated 0.75mm2(24 x0.2mm) temperature rated to 90°C.• Protection IP45.• Extern

Commentaires sur ces manuels

Pas de commentaire